A technical writer is reviewing a maintenance procedure before release. The engineer has approved the task, but one sentence still causes trouble.
The step says to check the hose and tighten the clamp if needed. It leaves three questions unanswered. Which hose? What counts as a leak? When does the clamp need tightening?
Shorter wording alone won't resolve these gaps. The writer needs the correct component name, an inspection method, and an approved response to the result. Without those details, a numbered list can still leave the technician guessing.
Writing work instructions requires both language control and task control. Writers must separate actions, establish safe starting conditions, and explain how workers confirm success. Documentation managers must also control revisions and prevent outdated instructions from reaching the workplace.
The standards and guides below support different parts of that work. Each faces the same practical test: can the reader follow a numbered step without asking a follow-up question?
- Language: Does the step identify the action and its object?
- Conditions: Does the reader know when the action applies?
- Verification: Does the reader know what result permits the next action?
STE Guide is an independent educational resource. It isn't the official ASD-STE100 website and doesn't represent ASD.
Table of Contents
- 1. ASD-STE100 Issue 9 Procedural Writing Approach
- 2. S1000D Procedural Data Modules
- 3. MIL-STD-40051-2 Technical Information Procedures
- 4. ATA iSpec 2200 Maintenance Task Writing
- 5. ISO/IEC/IEEE 26514 User Documentation Guidance
- 6. Microsoft Writing Style Guide Procedure Guidance
- 7. Google Developer Documentation Style Guide Task Instructions
- How the seven standards and guides differ for work instructions
- Turn One Rule Into a Repeatable Prompt
1. ASD-STE100 Issue 9 Procedural Writing Approach
ASD-STE100 is the Simplified Technical English standard. Its procedural approach controls vocabulary, sentence structure, and the way writers express actions.
The official ASD-STE100 website identifies Issue 9 as the replacement for earlier issues and revisions. The official specification remains the authority for exact requirements.

Separate language problems from missing engineering details
Before
Once the cover has been taken off, you should check the hose for any leaks and tighten the clamp if necessary.
After, with an approved component diagram and inspection method supplied
- Remove the cover.
- Identify the hose shown in the component diagram.
- Inspect the hose connection using the approved leak inspection method.
- If the connection leaks, follow the clamp adjustment procedure.
The rewrite separates actions without inventing a tightening value or assuming that tightening will repair every leak. The referenced procedures must remain accessible.
For maintenance and service instructions, this approach makes actions easier to scan and translate. However, controlled wording can't supply missing engineering knowledge.
Practical rule: A short sentence can still contain an incomplete instruction.
Writers should start action steps with verbs and place safety messages before exposure to the hazard. They should check unfamiliar vocabulary rather than replace precise technical terms with vague everyday words.
The procedure-writing explanation provides an educational starting point. Exact rule decisions require the official specification.
Reusable AI prompt
Rewrite [draft task] as numbered maintenance steps. Use [approved terminology] and [validated task details]. Put applicable warnings before affected actions. Keep each step focused on one action. Preserve component identifiers. Flag missing inspection methods, acceptance criteria, and adjustment limits. Don't invent technical details.
2. S1000D Procedural Data Modules
An access procedure written for one equipment configuration can appear in the manuals of several related configurations. References such as "the panel above" or "the previous illustration" lose their meaning the moment the module leaves its original context.
S1000D is an international specification for technical publications. It structures technical information in data modules that organizations can manage and reuse.
Procedural modules organize steps and supporting information within a defined structure. This suits defence, aerospace, and land-system publications with shared maintenance content.

Before
Remove the panel and then you can look at the wiring, but make sure the power is off first.
After, with approved isolation instructions available
WARNING: Electrical energy can cause injury. Complete the approved electrical isolation procedure before removing the access panel.
- Confirm completion of the electrical isolation procedure.
- Remove the access panel identified in the task illustration.
- Inspect the wiring for the defects listed in the inspection criteria.
Make reuse safe and specific
The warning now sits before the action that exposes the reader to the hazard. Each step names its object and its decision reference, so a maintainer can follow the numbered sequence in any manual without asking what to inspect.
Reuse cuts duplicate editing across configurations. It also multiplies any error, because a wrong applicability statement sends the wrong procedure to every manual that includes the module. Validate applicability against each configuration before publishing the module.
- Module scope: Keep each procedure focused on a defined task.
- Terminology: Use stable component names across modules.
- Safety placement: Associate each warning with the affected action using the applicable schema and project rules.
- Applicability: Confirm that the module's configuration information matches each equipment variant.
S1000D controls information structure. Sentence-level wording and technical validation still depend on the writing rules and engineering review the project applies. Writers should consult the applicable specification issue and project business rules.
Reusable AI prompt
Restructure [validated procedure] for a reusable procedural data module. Separate prerequisites, safety information, steps, and results. Preserve [component names] and [applicability]. Remove location-dependent wording. Flag missing references. Don't claim schema compliance or generate unsupported technical content.
3. MIL-STD-40051-2 Technical Information Procedures
Military maintenance procedures need more than direct verbs. Maintainers must know the equipment condition, required resources, task sequence, and conditions for safe completion.
MIL-STD-40051-2 is a United States Department of Defense standard for preparing digital technical information for interactive electronic technical manuals. It addresses content, structure, and delivery requirements.
Its task-oriented approach supports operation and maintenance of military equipment. Writers should confirm the applicable revision and contract requirements with the contracting authority.
Establish the starting condition before the action
Before
Make sure the valve is closed, then drain the tank by opening the drain cock and letting the fluid run out.
After, with approved preparation and fluid-handling requirements supplied
- Confirm that the isolation valve identified in the equipment diagram is closed.
- Position the specified collection container below the drain outlet.
- Open the drain cock.
- Let the fluid drain into the collection container.
- Check the task completion criteria before continuing.
This example separates the required condition from the draining action. It also exposes information that the original sentence omitted.
The production procedure still needs the approved valve identifier, container specification, fluid precautions, and completion criteria. An editor can't safely infer them.
A trained reader still needs the task-specific facts. Training isn't a substitute for component identification or acceptance criteria.
This approach works well for a maintenance task with controlled starting and finishing conditions. Its trade-off is preparation effort.
A complete task package takes longer to assemble than a simple action list. However, missing resources or conditions can stop the work after equipment becomes unavailable.
Reusable AI prompt
Convert [approved task description] into a maintenance procedure. State required equipment conditions and supplied safety controls before execution. Separate actions into numbered steps. Add supplied expected results. Flag missing resources, identifiers, disposal requirements, and completion criteria. Preserve all approved technical values.
4. ATA iSpec 2200 Maintenance Task Writing
Aviation task writers must connect preparation, execution, and verification. A clear removal step won't help if the technician lacks the correct tool or access condition.
ATA iSpec 2200 is an Air Transport Association specification for aviation technical information. It addresses the structure, content, and format of maintenance and operations documentation.
Its task organization helps manufacturers and operators exchange information consistently. Writers should use the applicable specification and publication requirements for exact implementation.
The FAA human-factors publication reports that maintenance personnel spend approximately 25% to 45% of their working time using maintenance documentation. That makes task navigation a practical concern, not just a formatting choice.
Before
After the bolts are loosened, slide the bracket out, being careful not to damage the wires that run behind it.
After, with the bracket and fasteners identified in the task illustration
CAUTION: The wires behind the bracket can become trapped during removal.
- Loosen the bracket bolts.
- Slide the bracket out while keeping it clear of the wires.
- Inspect the wires for damage.
Keep prevention ahead of inspection
Checking the wires afterward doesn't replace protecting them during removal. The caution must describe the risk before the technician moves the bracket.
- Preparation: List required tools and access conditions before execution.
- Identification: Match component names to illustrations and parts information.
- Verification: State the approved damage criteria and response.
This layout suits repeatable maintenance tasks. Its trade-off is document size, so writers should keep supporting explanations separate from the action sequence.
The worked work-instruction examples show how task wording can expose missing details.
Reusable AI prompt
Rewrite [maintenance task] with separate preparation, safety, action, and verification content. Use [approved component names]. Preserve damage-prevention instructions before affected actions. Number the steps. Flag missing tools, access conditions, and inspection criteria.
5. ISO/IEC/IEEE 26514 User Documentation Guidance
A settings tour fails the test when the reader only wants notifications on. The question for this standard is simple: does the plan produce a numbered action the reader can finish without asking where to start?
ISO/IEC/IEEE 26514 addresses the design and development of user documentation for software and systems. It supports planning, writing, and reviewing user information.
Use it to organize installation and operation topics around user needs. Exact requirements should come from the applicable official ISO and IEC publication.

Define the task boundary
Before
Once the app is installed and you have signed in, you can then go to the settings menu and turn on notifications.
After, for an app with the stated interface labels
Prerequisite: The app is installed.
- Sign in to the app.
- Open Settings.
- Turn on Notifications.
- Confirm that Notifications shows as enabled.
Installation stays outside this task. Authentication stays inside because the stated starting condition assumes no active session.
For existing users, list an active session as a prerequisite instead. Then step 1 can open Settings directly.
User testing should establish whether the boundary works. A reviewer should observe where unfamiliar readers pause, search, or ask for help.
The risk is breadth without precision. A planning document can list every user goal and still leave each action vague.
Controlled-language practices can support the writing stage. The before-and-after STE examples illustrate that distinction without replacing usability tests.
Reusable AI prompt
Draft a task topic for [user goal] using [verified interface labels]. State the audience, starting condition, prerequisites, numbered actions, and completion result. Keep unrelated setup outside the task. Flag missing permissions and platform differences. Don't invent interface labels.
6. Microsoft Writing Style Guide Procedure Guidance
Export instructions fail without warning. "Save the file to your computer" states the goal while leaving the control, the destination choice, and the success check unspecified.
The Microsoft Writing Style Guide is a public reference for product and technical content. Its procedure guidance emphasizes direct language, task-based organization, and consistent terminology.
Separate prerequisites from execution
Before
You need to be signed in, and then you can select the Export button to save the file to your computer.
After, for an application with an Export control
Prerequisite: An authorized account is signed in.
- Select Export.
- Select the destination folder.
- Save the file.
- Confirm that the exported file appears in the destination folder.
The rewrite separates account access from the export sequence and gives an observable completion result. The reader never has to ask whether sign-in belongs to this task or where the file went.
This approach suits software tasks with recognizable controls and a clear result. Writers can place account access, permissions, and required files before the numbered actions.
That split helps scanning only when readers can tell whether they meet each prerequisite. Naming the required account role lets a reader verify access before starting instead of discovering the requirement mid-task.
- Name the access requirement: Identify the required account role when permissions affect the task.
- Match the interface: Preserve control labels, including meaningful capitalization.
- Use consistent verbs: Avoid alternating between select, press, and click without a reason.
- Confirm completion: Describe a visible result when users could mistake an intermediate state for success.
Review boundary: The guide supplies no safety-message system for physical equipment, so writers adapting it for machinery must add the applicable hazard controls.
The same limit applies to troubleshooting. An error message that only explains the problem still leaves the reader stuck, so recovery steps need the same validation as any other procedure.
Reusable AI prompt
Rewrite [software workflow] as a task procedure. Put supplied access requirements before the steps. Use [verified interface labels] exactly. Give each numbered step a direct action. Add the supplied completion result. Flag missing permissions, destination choices, and recovery instructions.
7. Google Developer Documentation Style Guide Task Instructions
A deployment instruction can sound precise while leaving the most important command unspecified. "Run the deploy command" gives a reader nothing executable. Name the exact command and working directory.
The Google Developer Documentation Style Guide provides public guidance for technical documentation. Its task instructions emphasize clear sequence, direct wording, and consistent presentation. Teams that need stricter terminology or translation support can pair it with controlled-language practices.

Supply the command context
Before
If you want to deploy the app, you should first make sure that the build has passed, and then run the deploy command.
After, with a validated release procedure available
- Confirm that the build status is Passed.
- Confirm that the selected deployment target matches the approved release target.
- Run the deployment command from the release procedure.
- Confirm the deployment result against the release acceptance criteria.
The shared reference must supply the exact command, working directory, credentials, and relevant options. A rewrite still fails the follow-up-question test when any of these is missing.
Environment differences are the main risk in a release task. A command that works in one environment can target the wrong system in another. State required conditions before execution, use present-tense action wording, and distinguish text the reader enters from output the system displays.
The worked technical instruction example shows how to check action sequence and missing context in a full procedure.
Reusable AI prompt
Rewrite [developer task] using [validated commands], [environment], and [expected results]. State required conditions first. Number actions in execution order. Preserve command syntax exactly. Flag missing working directories, permissions, target identifiers, and failure responses. Never invent executable commands.
How the seven standards and guides differ for work instructions
| Item | Primary focus | Controlled vocabulary | Best for |
|---|---|---|---|
| ASD-STE100 Issue 9 Procedural Writing Approach | Clear maintenance and service procedures | Approved vocabulary with one meaning per word | Precise, translatable technical instructions |
| S1000D Procedural Data Modules | Structured, reusable technical procedure modules | No vocabulary specified; supports STE | Large programs needing reusable publication content |
| MIL-STD-40051-2 Technical Information Procedures | Digital technical manuals for defence equipment | No vocabulary specified | US defence maintenance and operator procedures |
| ATA iSpec 2200 Maintenance Task Writing | Aviation maintenance task structure and data exchange | No vocabulary specified; can be paired with STE | Airline and aircraft maintenance documentation |
| ISO/IEC/IEEE 26514 User Documentation Guidance | Planning and developing software and systems user documentation | No controlled vocabulary | Task-based user guides for software and hardware |
| Microsoft Writing Style Guide Procedure Guidance | Plain-language procedures for software users | No closed vocabulary | Practical product and software instructions |
| Google Developer Documentation Style Guide Task Instructions | Clear task instructions for developers and users | No controlled vocabulary | Localisable developer and technical documentation |
Turn One Rule Into a Repeatable Prompt
A documentation team should choose the standard that matches its deliverable. Language control, information structure, contractual delivery, and user-task design solve different problems.
Combining compatible guidance often works better than treating each reference as a complete writing system. A structured module can still contain vague sentences. A clear sentence can still describe an unsafe sequence.
The team should express a selected principle in its own words. For example, each numbered step should identify an action, its object, and any condition that changes execution.
Build the prompt around approved inputs
A reusable prompt needs more than an instruction to simplify text. It needs boundaries that prevent the model from completing missing technical details through invention.
Rewrite [source procedure] for [audience] using [selected standard or guide]. Use only [approved technical facts and terminology]. Produce numbered steps with one main action each. Place supplied warnings before affected actions. Preserve identifiers, interface labels, commands, and technical values. Flag missing conditions, acceptance criteria, and exception responses separately. Don't claim conformity.
The writer should provide the relevant rule explanation alongside the prompt. The model shouldn't reconstruct a copyrighted specification from memory.
- Technical review: An engineer verifies sequence, limits, hazards, and acceptance criteria.
- Editorial review: A writer checks vocabulary, references, sentence structure, and consistency.
- Workplace validation: A representative user follows the procedure under controlled conditions.
The reviewer should record follow-up questions rather than answer them immediately. Each question identifies information that may belong in the procedure, illustration, prerequisite, or training material.
Validation must also consider presentation. A clear instruction can fail when the reader must search another screen or identify an unlabelled component.
The free STE checker can flag likely language problems before detailed review. It is a heuristic tool, not an official conformity check.
Writers can consult the writing-rule summaries and vocabulary explanation when reviewing flagged text. The specification access guide directs readers toward the authoritative document.
A checker can miss problems or flag correct wording. A qualified reviewer must compare the draft with the official specification.
When this site's explanation differs from the official specification, the official specification is correct. Release approval should depend on validated task content, not a clean checker result.
STE Guide offers independent explanations, worked examples, and a structured learning path for technical procedure writing. Visit STE Guide to practice turning vague maintenance and software sentences into clear, reviewable steps.